Texas A&M Football Aquatic Training
- Client
- Texas A&M University Athletics
- Year
- 2013 to 2014; Bright Football Complex 2026
- ADC role
- Design; 2026 aquatic engineer to the architect
- Design team lead
- Populous (both projects)
- Status
- First facility complete; Bright Complex in design
Recovery and strength pools for Aggie football, and twelve years later the hydrotherapy pools for the renovated Bright Football Complex.
ADC first designed Texas A&M football's aquatic training facility in 2013 and 2014: about 2,600 square feet of warm-water strength training pools plus hot and cold therapy and rehabilitation pools, finished with a final punch list in July 2014. In 2026, Populous brought ADC back for the hydrotherapy and recovery pools in the renovated Bright Football Complex, where ADC is producing the Phase 1A drawings and the pool specification. Twelve years apart, the two commissions show what an athletic department values most: pools that keep working, and an engineer who is still there when it is time to build the next one.
Photographs of this project are being added.