Planning, design; Phase 2 aquatic design and construction-phase services
Status
Phase 1 complete; Phase 2 bid 2023
The first municipal aquatic center in the country with a surf-in-place ride, and it runs without a continuing subsidy.
Republic was among the fastest-growing towns in the Springfield region and wanted a pool that would serve every age and pull visitors from neighboring communities, spreading its cost across a wider base. ADC built the design around a surf-in-place ride, the first at any municipal aquatic center in the country, with a dual slide tower, interactive play, zero-depth entry, a six-lane 25-yard pool and 1 and 3 meter diving. The center operates in the black. In 2022 the city brought ADC back, with Sapp Design, to add a lazy river complex with an inner-tube slide tower, waterfalls, cabanas, a pedestrian bridge and night lighting.