AQUATIC DESIGN CONSULTANTSAquatic-only engineering since 2003
← All projects ATHLETIC Oklahoma City, Oklahoma

Oklahoma City Thunder Aquatic Training Facility

Client
Oklahoma City Thunder (NBA)
Year
2009 to 2012
ADC role
Design
Status
Complete (2012)

A custom aquatic conditioning facility for an NBA team, with depths set for basketball players.

Like every elite NBA team, the Oklahoma City Thunder treats conditioning as part of winning. The club commissioned ADC directly to design a fully equipped aquatic training facility shaped around basketball: about 2,600 square feet of warm-water strength training pools and hot and cold therapy pools, with variable depths set for tall athletes, trainer supervision areas and specialized water chemistry and controls. ADC worked with the team's trainers and coaches to match the pools to basketball-specific conditioning, and the facility was completed in 2012.

Photographs of this project are being added.